For universities and colleges

The exam board should not be the first to know.

SentinelXR Campus

Degree structures, credit transfer, cohort analytics and a clean accreditation trail. Orin reads attainment as it moves, so a drifting module surfaces in week five rather than at the board.

Campus hero — a lecture theatre, a quad, or registry staff at work

Deans · registry · quality and standards · IT

What Campus does

Programme and module structure

Multi-year degrees, optional pathways, credit transfer and prerequisite chains, held as one structure rather than a spreadsheet per department.

Attainment that moves

Cohort analytics against each student’s own baseline as well as the cohort. Orin flags the modules where the shape of attainment is changing, with the submissions it read.

The accreditation trail

Every grade change, every override, every Orin suggestion and who acted on it — exportable as evidence, not reconstructed after the fact.

Registry without re-keying

Timetabling, enrolment and awards write to the same record. SIS and finance integrations are read-write, and conflicts surface to a person.

Why week five matters

By the exam board, the cohort has already graduated the problem

A module drifts quietly

Attainment moves a band over two intakes and nobody owns the number, because no single tutor sees the shape across years.

Grades arrive too late to act

A board in July cannot change what happened in October. It can only record it and hope the next cohort is luckier.

Concept evidence arrives weekly

Understanding tracked idea by idea shows the drift while the teaching can still change, which is the only version of this that helps anyone.

Orin in Campus

Notices, offers, defers

The same intelligence runs in all four products, and the same rule holds everywhere: it observes and proposes, then stands back. It cannot change a grade, a record or an enrolment.

More about Orin →

Orin suggests

Attainment in Structural Mechanics has moved a full band since the January intake. The drop concentrates in students who took the optional maths bridge.

Based on the last four assessment points against the same module in the two prior years.

Take a look Show the data

See Campus against your own data

Campus deployments usually start with one faculty and a term of parallel running.

Enquire now